Project name: Lobatse Immediate Works Detailed Design
Client name: Water Utilities Corporation
Location: Botswana
 
Project description 
ACE GIBB was appointed to undertake the detailed design and produce tender documentation for the components identified for the Immediate Works programme in the Master planning phase.

 

GIBB responsibilities 
  • Topographical survey
  • Soils Investigation
  • Environmental studies
  • Design of 60km of 500mm dia. DI pipeline from Gaborone to Lobatse
  • Design of 17km 500mm dia. DI ring main in Lobatse
  • Strengthening of internal reticulation within Lobatse
  • Surge analysis and design of mitigation measures
  • Design of 3 No pump stations
  • Design of one 10Ml and one 16Ml reinforced concrete reservoirs
  • Design of power supply, control and instrumentation, telemetry and SCADA systems
  • Tender documentation
  • Network modelling
  • Environmental scoping
  • Planning for design horizon

 



 



Head Office: 54 Maxwell Drive, Woodmead 2191, Johannesburg, South AfricaTel: +27 (0)11 519 4600